Tuesday, June 27, 2006

 

Raising the Gher


We, all 17 of us wound up in westport one night. Chopped up the newly purchased gher with chainsaws and fingers. Then proceeded to carry sections of it in piece by heavy piece. Anyway we made it in the end. Very wet. Stright away into carrying rocks to mound up a small elevated platform and stop the ground water, ( to some extent). Lots of assembly going on. Heres some photos of the erection and subsequent heating.

Tying it all together

Tying the 3 bamboo lattice sections of wall together

Walkin the wall

shifting walls.JPG

Tying the walls on

layout.JPG

Francie doing her bit

francie.JPG

The glamorous inside with the water proof tarping under the floor boars and up the walls.

inside.JPG

Jonah’s Wonderfully hot pot belly was installed the same day
potbelly.JPG

With a kinky flue up through the middle

flue.JPG

And here it is, one day transported, erected, heated, the SHV Gher/pleasure palace.

gir only.JPG

A shot of the site to finish

the site.JPG

By Dan http://www.savehappyvalley.org.nz/blog/?p=82#comments


Comments: Post a Comment



<< Home

This page is powered by Blogger. Isn't yours?